Clueless
Clueless!8million shares trade day of conferance call 13million the following on a .05 cent mis no way it was managment sell en mass option awarde awarded at 5.25.
The reason was the inflationary effect on the last of awarded contracts for Merrill Crowe and the a 70million bump for screens and additional contigincy funds The screens also cause a 6-8month delay into 3rd quarter.Not only that the pre screens being tested on existing secondary crusher and small HPGR are shutting production for 30days.
Wharf mine 2nd largest contributer of free cash flow has entered in lower grade portion of sequencing and has quidance CAs cost jumping from $997 -$1225-1325
First quarter Palmarejo gets hit with a 25million annuall tax hit..
Rochestor buid is now estimated to be 597m.
Silvertip had such phenomenal drill result that mill expansion was needing to be even larger so the accelerated build came to a screeching halt as bid for the planned expansion came in way to high .So the exploration driven larger mikk expansion needs studies and cost analysis as well as repermitting,.So Silvertip timeline is after Rochestor is finished.Coeur is weighted to second half but production will be flat for the year.
Kensington has a three year minelife of reserves.I suggest Feb 16,2022 Coeur filed with SEC an 8K 3 Technical Report Summary's on all their active mines currant as of Dec 31.2021.These are thouough and produced to shine a fatual light on their mines.that are producing with all the resrves cutosss,sensitivities,Cap ex for the minelife of currant reserves.