RE:Torch installation un client"s A facilityAs usual, reading fully is always a good Idea. "The installation should take approximately 3 to 4 weeks, after which a Site Acceptance Test (SAT) will be performed. The SAT is scheduled to be completed before the end of July 2022. Both the installation and the SAT will be conducted by Client A, and supervised by PyroGenesis personnel. Between the arrival of PyroGenesis proprietary 1 MW plasma torch at the Clients site and the SAT, there will be a number of tasks that will need to be completed (such as the training of local personnel by PyroGenesis staff)."