Callinex Intersects 9m of 12.53% Copper Highlights:
- PBM-161-W1 intersected 9m of 12.53% copper ("Cu") including 5.5m of 17.37% Cu;
- PBM-161-W2 intersected 14m of 5.71% Cu and 6.50m of 4.48% Cu; and
- At 110m below surface, the most shallow intersection to date, PBM-163 intersected 6m of 2.34% CuEq.
VANCOUVER, BC, March 1, 2022 /PRNewswire/ - Callinex Mines Inc. (the "Company" or "Callinex") (TSXV: CNX) (OTCQX: CLLXF) is pleased to announce results from an additional drilling from the 2021 exploration campaign to expand the high-grade copper, gold, silver and zinc Rainbow Deposit (the "Rainbow"). The Rainbow is located at the 100% owned Pine Bay Project within a mineral lease, less than 250m from a high-voltage hydroelectric power-line and 550m from a historic shaft with direct road access to processing facilities in Flin Flon, Manitoba (District Overview Map).