RE:Jim Rickards issues a Seabridge Buy Callthe wheels already may already be turning on a sea buyout. Seabridge's road building and electrification moves might have been dictated by the prospective purchaser[s?]..... Otherwise @ a cost of possibly as much as $1 million per kilometer of roadway built or thereabouts - why would seabridge be building the roadway to the calm before the storm camp... If I remember correctly the calm before the storm campsite lies about 3 kilometers past Sea's proposed tunnel access location-adit...