news
ORIGINAL: E79 Resources Expanded Drill Program Commences at the Myrtleford Gold Project's Happy Valley Prospect
2022-05-05 08:31 ET - News Release
Vancouver, British Columbia--(Newsfile Corp. - May 5, 2022) - E79 Resources Corp. (CSE: ESNR) (OTCQB: ESVNF) ("E79" or the "Company") is pleased to report the commencement of the expanded drill program at Happy Valley which will target three prospects that have yet to be drilled. These three targets are within 500 m of the initial high-grade gold discovery announced on November 15, 2021. E79 is committed to building on and drill-testing targets within the 12 km-long Happy Valley corridor located in the southern area of the Myrtleford Project in Victoria, Australia.
DRILL TARGETS
Champion/Franklin Reef:
- Inaugural drill program testing beneath historical workings with multiple reef structures.
- Mapping and rock chip sampling have identified numerous key target areas for initial shallow drill testing.
Manager's Hill:
- Inaugural drill program testing has identified a strong geochemical anomaly which coincides with multiple historical surface workings which are along trend from Champion/Franklin Reef structures.
Patrick Donnelly, E79's President and Chief Executive Officer, stated, "We're excited to commence our first drilling program targeting multiple quartz reefs in close proximity to the high-grade Happy Valley gold system.
"The Company continues to expand the drill program along the 12 km-long Happy Valley trend to identify its potential to deliver multiple high-grade gold systems, building on the success we've had on the Myrtleford Project so far."
The first drill holes have commenced targeting beneath historical workings located within 500 m of the Happy Valley gold system. The aim of the drill program is to identify multiple shoots of mineralization within close proximity to the high-grade gold zone at Happy Valley as demonstrated by previous intercepts, including:
- 11.10m @ 160.45 g/t gold from 190.4m including 0.6m @ 2,430 g/t gold (hole HVD003); and
- 5.35m @ 32.07 g/t gold from 149.8m (hole HVD007).
For more information on these previous drilling results, please go to https://e79resources.com/news/.
The Franklin/Champion area is the first target to be drilled, and has already been geologically mapped and rock-chip sampled with results up to 7 g/t gold received. The presence of historical mining stopes that were subjected to recent underground geological mapping indicates a moderate-to-steep plunge towards the southeast which will be the focus of the initial program. The program will then move to the Manager's Hill prospect located 300 m along strike from Franklin/Champion. None of these mined reefs have ever been drill tested so they represent a great exploration opportunity for the Company.
Figure 1 - Happy Valley plan map showing current drill targets at Franklin/Champion and Manager's Hill
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/8350/122862_f75a17981457da47_001full.jpg
Figure 2 - Happy Valley schematic cross-section showing proposed drilling at Champion/Franklin Reef
To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/8350/122862_f75a17981457da47_002full.jpg
Figure 3 - Historical underground workings showing the Franklin laminated quartz reef currently being drill tested
To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/8350/122862_f75a17981457da47_003full.jpg
NEXT STEPS
- At Happy Valley, inaugural shallow drill testing has commenced at Champion/Franklin Reef. Manager's Hill will be the next target to be drill tested.
- A 3D model of the Happy Valley system is to be constructed once the interpretation of the drill core and assays have been received.
- Rock chip assay results from preliminary mapping of historical workings along the Happy Valley trend are imminent and will provide a platform to generate drill targets along the extensive 12 km corridor.
- At Twist Creek, an inaugural drill program is ongoing with four additional targets remaining to be tested beneath historical workings over a 3 km strike length. Further to this, an ongoing first-pass rock chip sampling and mapping program along the 7 km long trend is in progress.
- At Beaufort, a review of the project including structural mapping has been completed and near-surface targets have been identified. Planning for the next drill program is in progress.
Figure 4 - Regional plan of the Myrtleford Project (EL6724) showing current drilling areas
To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/8350/122862_f75a17981457da47_004full.jpg
HAPPY VALLEY GOLD PROSPECT
The Happy Valley Prospect is situated in the southeastern portion of the Company's Exploration Licence EL006724 in Victoria, Australia (Figure 3). It lies within a 12 km-long trend of historical small-scale mine workings. The Happy Valley Mining Centre has documented historical production of 34,200 ounces of gold predominantly between 1866 - 1875 and produced an average grade of ~31 g/t gold. To date, only limited modern exploration has been conducted at this prospect, with recent drilling by E79 defining bonanza-grade mineralization at depth.
Gold mineralization at Happy Valley occurs as quartz veins within carbonate-altered sedimentary units of Lower Ordovician age (448 - 443MA). Regionally, mineralization appears to be proximal and related to the emplacement of several major regional Devonian-age (420-360 MA) granitic plutons. The gold can occur as free particles within the quartz veins and can also be associated with sulphides, including pyrite and to lesser degrees arsenopyrite and galena.
TWIST CREEK GOLD PROSPECT
The Twist Creek Prospect is situated in the northern portion of the Company's Exploration Licence EL006724 in Victoria, Australia (Figure 3). It lies within a 7 km-long trend of historical small-scale mine workings. The Twist Creek Mining Centre produced gold at an average grade of ~31 g/t. Prior to exploration work carried out by E79, no modern exploration had been conducted at this prospect and it remains highly prospective.
QUALIFIED PERSON
Peter de Vries, MAIMM, MAIG, a "Qualified Person" as defined by National Instrument 43-101, has read and approved all technical and scientific information contained in this news release. Mr. de Vries is the owner of Geological, Educational and Mining Services (GEMS) Pty Ltd, a geological consulting services company based in Victoria, Australia, and is Exploration Manager for E79 Resources.
Information contact
Patrick Donnelly
President and Chief Executive Officer
E79 Resources Corp.
Phone: 604.288.8082
Email: patrick@E79resources.com
Website: www.E79resources.com