Wowsa . A Massive Amount Of Assays Coming All Summer. Additional planning to confirm structural continuity for some areas with a diamond drill holes (DDH) have been designed and consist of 33 holes with total of 7400m of core drilling.
A total of 12 RC drill holes have been completed to date, which represents 22% (2,350 m) of the planned RC drill program.