RE:RE:RE:RE:Very nice! If referencing my post ...yes ....whatever it takes to get to that 2 m oz threshold
new added at MP, new added from yellorex drilling, add what's already at Con ....as soon as assays done along with our 1.2 ....we gotta be there and he is about a third into his drilling plan ?
altho I don't know what they have to do to add existing con into the picture, but banking that he will find a way.
those two deep holes will be very interesting and a lot of money being spent on them....If he pulled this drills off on the ice road he must be done them....on the other hand if he accessed the drill site from the con mine site he may have bought a little time.....I am not hearing the hum of drills in the distance ...so I am wondering.
GP will have work and takes time to meet the 43-101 standard ? Just thoughts ...