RE:RE:RE:RE:RE:RE:RE:Sorry DudesSasha11 wrote: you talked 90% recovery to nickel grade battery material. Not true and not in the PEA.
Never said it was in the PEA. But just because it wasn't factored in then doesn't mean it couldn't be in the future PFS and/or FS.
https://stockhouse.com/news/press-releases/2020/01/07/fpx-nickel-achieves-recoveries-up-to-99-5-in-production-of-high-grade-nickel
Sasha11 wrote: The PEA assumes infrastructure mainly power will be provided.
The project is 110km from BC Hydro's grid and part of the initial capex provides for connecting to this. They aren't assuming that power just appears like mana from heaven.