Getting close to initial well disclosure The first well to begin flowback following the stimulation was the GH 19-3 #3 well, which came on-line on May 25, 2022.
The GH 19-3 #2 and GH 19-3 #4 wells was expected to be on-line shortly thereafter.
So, if they release well by well, we should be very close..