RE:RE:RE:RE:RE:Ramp UpI remember reading that too, and was also wondering what it meant.
There is a possibility that the plant equipment has the design capacity to have a through put much more than the 1.2 mil tpa through put.
That would be 3.6 mil tpa at a 300% increase, and acheivable if the equipment was over sized and ordered for this.
1.2 mil tpa equates to 3,290 tonnes per day of raw ore input, 3.6 mil tpa is 9,860 tonnes per day.
All this is small potatoes if the planning allowed for this.
The other 150% ??? Im stuffed if I know what that is.
And to talk in %'s is not a clear way to explain to us on issues.
Experience wise, it is better to over design for the future and avoid expensive upgrades..