Star Royalties is very supportive of Sabre Gold Mines & 💥 Sabre Gold holds 100% interest in two near-term North American gold producers: the fully permitted Copperstone gold mine located in Arizona, USA, and the Brewery Creek gold mine located in Yukon, Canada, both of which are former producers.
Management intends to restart production at Copperstone followed by Brewery Creek in the near term.
In this video SGLD's Chief Operating Officer updates investors on the Yukon Brewery Creek mine re-start plans.
https://www.youtube.com/watch?v=pMmh36_TDIs
Michael Maslowski
Chief Operating Officer
Mr. Maslowski is a geological engineer with a career in the mineral resource industry spanning more than 35 years in exploration, engineering, underground and open pit mining design and operation in the Americas and East Africa. Mr. Maslowski previously worked with Golden Predator from 2011 to 2014 as Vice President of Exploration and then Chief Operating Officer, expanding the Brewery Creek resource more than 5 fold in 3 years and directing the Brewery Creek Preliminary Economic Assessment Study. Since 2017 he has been the Technical Services Superintendent for Teck Washington Inc. at their Pend Oreille mine in NE Washington State, an underground lead-zinc mine. Prior to 2011, he was with Coeur d’Alene Mines for ten years in numerous positions including Director of Exploration and Assistant General Manager of the Palmarejo Mine in Mexico. He was the team leader for the discovery of the Diamond Hill Mine for Pegasus Gold then was responsible for advancing the mine into production. Mike is a member of the Society for Mining, Metallurgy and Exploration (SME) and the American Institute of Professional Geologists. He holds a B. S. in Geological Engineering from the Colorado School of Mines and is a Certified Professional Geologist (CPG) with the American Institute of Professional Geologists (AIPG) and a Qualified Person (QP) as defined by National Instrument 43-101.
https://www.sabre.gold/corporate/management/