RE:RE:RE:Ramp Up.Sorry on the mistyping of the 640,000, what I should have said is I'm assuming about 500,000 MTUs Wo3 right from the start of off 1.2 million tonnes of ore.
So what I was trying to ask is if the grade is higher, do you think Almonty will focus on producing a level number of 500,000 MTUs and benefit from requiring less than 1.2 million tonnes of ore to get to 500,000 MTUs so lower cost to produce 500,000 MTUs; or,
Do you think they will keep the tonnes of ore relatively consistent at 1.2 million tonnes and end up with additional MTUs of Wo3 resulting in additional revenue.
Either way, higher grade is a great "problem" to have:)