RE:NO. These are specific large hitsCurrower wrote: They were incorporated into the entire Fenelon Initial MRE. SINCE THEN muck sampling results and infill drilling and expansion drilling will double or triple the grade on the entire deposit as you already know human garbage and will be much better than Detour grades. They already were before. Detour has trouble getting .95 of one gm per ton. LOL The Revised MRE will be 6 to 7 million ounces with a much better strip ratio which you also know human Garbage on a postage stamp of our enormous Abitibi land package next to Detour. When is Agnico giving us back Detour East BaCCANEER. We want to save them money? LOL NO SALE TO AGNICO GLTAL TAXPAYING RETAIL WALLBRIDGE INVESTORS
Muck sampling results? they arent doing any muck sampling. Infill drilling doesnt increase the grade, and thinking they will double or triple the grade is nonsense. Detour is bulk mineable which is why they can do 60k to 80k tonnes per day. You couldnt do that if it werent bulk mineable.
You dont know what youre talking about because the only thing you know is how to pick up shiit and overwater cannabis plants.
Bucco:)