AUAUHole 243 included 2.55 g/t Au over 14Hole 243 included 2.55 g/t Au over 147.8 metres (including 13.49 g/t Au over 24.4m) Hole 239 included 111.3m of 1.45 g/t Au including 3.1 metres of 39 g/t at the bottom of the hole at 418 metres Hole 244 included 76 metres of mineralization including 6.1m of 1.48 g/t Au Hole 245 included 15.2 metres of 3.4 g/t Au at a depth of 177 metres. ) Hole 239 included 111.3m of 1.45 g/t Au including 3.1 metres of 39 g/t at the bottom of the hole at 418 metres Hole 244 included 76 metres of mineralization including 6.1m of 1.48 g/t Au Hole 245 included 15.2 metres of 3.4 g/t Au at a depth of 177 metres. This is from last round of drilling, 32 holes due from assays, then another 6 holes from high grade area, highlighted big deal if follow up is as good.