GREY:VITFF - Post by User
Post by
phoenix_traderon Sep 15, 2022 11:27am
240 Views
Post# 34964492
2022 Raven drilling (25,000 M) not included in Initial Res.
2022 Raven drilling (25,000 M) not included in Initial Res.Results from the continuing 2022 drill program at Raven have not been included in this maiden resource and will be incorporated into subsequent resource updates. "In 2022, we have carried out Victoria's largest ever exploration program, with 25,000 metres of drilling planned to expand Raven along strike and at depth." Mineral resource estimate discussion
The drill hole database utilized for this MRE utilizes 78 diamond drill holes collared between August, 2018, and September, 2021, and comprises 11,956 assays from 18,217 m of drilling. Additionally, 55 surface trenches with 3,464 assays and 7,443 m of sampling were included in establishing the MRE.