RE:RE:CRE Drilling ResultsDrilling in that region is probably done or finishing in that area. There is some snow showing up and days are getting shorter.
Usually October is when you pack it in around there.
So like Blagger mentionned, most labs are swamped and may be up to a couple months behind with their delivery dates.
Then, for us the drilling results would not do much good. What will is the NI 43-101.
(National Instrument 43-101 (the "NI 43-101" or the "NI") is a national instrument for the Standards of Disclosure for Mineral Projects within Canada.)
And that happens when a qualified geologist gathers all the lab reports and puts those in a 3d software that can output mineral tonnage in the end. I believe that JSL fits the bill for this one