When EXACTLY did these "talks" break down??From the original press release dated October 28 2021:
PyroGenesis was recently informed that, after a competitive bidding process, it had been selected to provide its plasma based thermal process equipment in a two-phase project geared to providing a land-based system to destroy PFAS. The first phase is to provide pilot testing. The second phase is geared to a full fabrication, furbishing and commissioning of a fully commercial land-based system. The time to completion is, from the signing of the contract, approximately 6 months for the pilot system with the timeframe for the full system to be determined based on Phase 1.
Enough from me..
My guess is this has/will ruin many people's long weekend.