RE:RE:RE:When are Sequoia Lab results due ? Drill holes DG2022-01 to DG2022-03 were drilled 22m south-southeast of the initial 2021 discovery hole in Sequoia. The first hole was drilled vertical with the following two holes being drilled to the east (DG2002-02) and west (DG2002-03). The intercepts in the angled holes suggest we are drilling of the southern edge of an eruption center.
hopefully when they drilled the directional (east , West ) Holes, the core stayed in the CK (coherent Kimberlite) formation for best chance at bigger diamond size.