RE:RE:Gas is flowing on time . congrats to all holders Bobwins wrote: This is a solid well, very close to the range estimated by Trillion before the drill. The output will be reduced for production to 50 to 60% of the best test results to maximize total production and recovery of gas from the well. So expect 3.5 to 5 mmcfpd actual production. They have perforated the best sections of the well. Eventually when the well runs down, they could go back and perforate the other 10 feet of pay and extend the life of the well.
Good Morning All,
A correction, and it is a good thing, the other 10 feet of pay( upper gas zone) is actually 35 feet. Best wishes to All, Sincerely, Topseeker