Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Alta Copper Corp. T.DNT


Primary Symbol: T.ATCU

ALTA COPPER CORP. IS AN EMERGING COPPER DEVELOPER ADVANCING WITH THE GLOBAL SHIFT TOWARD ELECTRIFICATION AND DECARBONIZATION. Alta Copper Corp. is focused on the development of its 100% owned Cañariaco advanced staged copper project. Cañariaco comprises 97 square kilometers of highly prospective land located 150 kilometers northeast of the City of Chiclayo, Peru, which include the Cañariaco Norte deposit, Cañariaco Sur deposit and Quebrada Verde prospect, all within a 4km NE-SW trend in northern Peru¿s prolific mining district. Cañariaco is one of the largest copper deposits in the Americas not held by a major.


TSX:ATCU - Post by User

Post by swpbon Nov 10, 2022 4:40pm
202 Views
Post# 35089769

IVN.TO mines in DRC Africa has 11 billion lbs copper

IVN.TO mines in DRC Africa has 11 billion lbs copper
Kamoa-Kakula Mining Complex in Africa 11billion lbs copper Market cap $13.25 billion Kamoa-Kakula Mining Complex The Kamoa-Kakula Copper Mine a joint venture between Ivanhoe Mines (39.6%), Zijin Mining Group (39.6%), Crystal River Global Limited (0.8%) and the Government of the Democratic Republic of Congo (20%) is a very large, near-surface, flat-lying, stratiform copper deposit with adjacent prospective exploration areas within the Central African Copperbelt, approximately 25 kilometres west of the town of Kolwezi and about 270 kilometres west of the provincial capital of Lubumbashi. Key initial projections from the Kakula 2020 DFS The study evaluates the development of a stage one, 6-Mtpa underground mine and surface processing complex at the Kakula Deposit of 7.6 Mtpa, built in two modules of 3.8 Mtpa, with the first already under advanced construction. The first module of 3.8 Mtpa commences production in Q3 2021, and the second in Q1 2023. The life-of-mine production scenario provides for 110 million tonnes to be mined at an average grade of 5.22% copper, producing 8.5 million tonnes of high-grade copper concentrate, containing approximately 10.8 billion pounds of copper.
<< Previous
Bullboard Posts
Next >>