Flurry of well news to continue to year end.Back on the grid for just a minute. Coming up news on tap.
1. Initial flow from first well was 7 mm(million) cf/d. Current gas sales production has started at 3 mm cf/d from the lower 2 of 5 zones and will continue to be ramped up over time perhaps back to 6 mm cf/d.
2. Expect log results as early as tomorrow on the second well (AT-3) peforation with perhaps initial flow rates. And eventual news on start up production flow rate.
3. News on rig movement to third well location around the platform dates and timing will be released by Art. Possible perforation and flow rates by Christmas. We may even see some work started on the fourth well by year end.
This is the minimum news to be expected by year end. A possible 10-15 mm cf/day of gas production by year end.