RE:RE:RE: Jiama Copper Mine is getting better and better. Exploration The 2021 exploration program at Jiama Mine consists of 12 drill holes for 17,418 m, focused on extremities of Jiama deposit, in which the remaining nine drill holes for 14,606 m need to be completed in 2022. . By the end of Q3 2022, a total of 9,591.66 m drilling was completed, with borehole logs of 5,270.29 m and samples of 1,600 pieces. In addition, the other exploration program with eight holes for 10,222 m concentrated on the boundary of the Jiama deposit was planned early this year, awaiting the approval from the Natural Resources Bureau of Mozhugonka County following the submission of the application materials for the land leasing. Third, to delineate one to two new target areas, a prospecting program at Bayi meadow was initiated in Q1 2022, with geological investigation of 37.31 km2 , soil and rock survey of 26 km2 respectively, and 12 drill holes for 5,168 m,During the three months ended September 30, 2022, the Jiama Mine produced 21,254 tonnes (approximately 46.9 million pounds) of copper, an increase of 12% compared with the three months ended September 30, 2021 (18,947 tonnes, or 41.8 million pounds). nice share!