great drilling results !The reported drilling totals 2,200m and represents the fifth discovery of new mineralisation in the ongoing +50,000m program, which was designed to increase the oxide component of the Project's 0.6Moz Au (Indicated) plus 2.3Moz Au (Inferred)(1) Mineral Resource.