RE:new video of Almonty processing plantThis is a bit different from the old 3D flyover video At the 3.00 minute mark :-
https://youtu.be/sdKj2oCu6Ko
The new plan has :-
- Reduced footprint on site with :-
- Less buildings, crushers, screens and coveyor belt gantries.
A significant amount of money has been shaved off the budget.
It looks like they have done away with the Tertiary Cone Crusher (Pebble Crusher) and opted to truck the over size up the hill to be reintroduced into the dump hopper ???
Ore Storage building capacity looks 3 times larger than the old plan, and also a well planned outlook to ensure the process plant can run if there is a equipment breakdown or scheduled maintaneace stoppages down line.
Two mills to start with, and two more to be added for ramp up in the latter days and space allocated.on initial build.
Everything after that is the chemical process which looks to be similar to most.
One bare spot South of the Tailings Thickener I think is for the chemical neutralisation and paste pumping plant ???
Maybe an unfinished 3D vid but great to see.