RE:RE:RE:RE:RE:RE:RE:Surface samples continue, no drill holes for at least 6 Yes we can. My Cdn Ministry of Mines guide to prospecting during the 1930's Depression states that, as a Rule of the Thumb, the potential dip of a vein is 1/3 of its length. So you can expect a 90M vein to have 30M of dip.