Video with CEO Video with interim CEO of HAMR.c HAMRF discussing recent drill results from the Silver Strand Project.
Some of the drill highlights include
- Six of the nine drillholes returned >100 grams per tonne g/t Ag
- SS22-017 intersected 2.9 g/t Au over 8.4 metres including 4.4 g/t Au and 74.5 g/t Ag over 1.8 m (demonstrates the potential for significant gold grades at Silver Strand!)
- SS22-015 intersected 3 mineralized zones, including 613 g/t Ag over 0.5 metres extending mineralization to 65m below historical workings
He mentions that what’s next for HAMR is running geophysics along the 5.85km so they can compare and contrast with other shoots to see if they are similar. + the video showcases the history behind the mine.
https://www.youtube.com/watch?v=Ab1GhkSS4-Q