Silver Strand Results HAMR.c HAMRF released drill results from the Phase II drilling program at Silver Strand earlier this month.
Highlights
- Six of the nine drillholes returned >100 grams per tonne g/t Ag
- SS22-017 intersected 2.9 g/t Au over 8.4 metres including 4.4 g/t Au and 74.5 g/t Ag over 1.8 m (demonstrates the potential for significant gold grades at Silver Strand!)
- SS22-015 intersected 3 mineralized zones, including 613 g/t Ag over 0.5 metres extending mineralization to 65m below historical workings
The CEO mentioned that “the new results demonstrate consistent #gold and #silver values in mineralization beneath and adjacent to the historical mine workings at Silver Strand.”
https://silverhammermining.com/news-releases/2023/