RE:Guluc 2 WellFredo51545 wrote: This well should contain 15-20 BCF of gas. How much is recoverable is hard to say. Will Art consider a dual completion? Initial stabilized flow rate should be much better than the first two wells, maybe 5mmcf/d versus 3-3.5 mmcf/d??
70 meters of gas pay, almost tripple from the first two wells. I'm going with 8-12mcf.
Bring on next week lets go!
GB