RE:RE:National Bank - PMET/FL - Auto Deals ForthcomingThe last release dated 1/30/23 had a total of 3787 meters of drilling with only 183 meters TOTAL ( 5%) that has any economic lithium values and the zones are way down at the 220 to 250 meter level ( see tables from the release ) DETAILS MATTER . Good luck removing all that waste rock and keeping it separated from the ore way down at that level . The release before that dated 1/18/23 drilled a total of 4947 meters with only 425 meters of economic lithium ore . THIS PUMP AND DUMP DEPOSIT WILL NEVER GO INTO PRODUCTION , HAVEN'T SEEN THIS BIG OF A SCAM SINCE BRE-X . LITHOMON , PLEASE ENLIGHTEN ME WITH "DETAILS" IF I AM FULL OF IT OR GET OFF THIS F'ING BOARD WITH THIS DOG COMPANY . STOCK PRICE IS A POPULARITY CONTEST IN THE SHORT TERM . ENOUGH IS ENOUGH .