PowerThe ridiculous headline aside, an insightful talk with Trevor at VRIC. Back half talked mostly about external developments in Yukon and further to the tweet we saw last week on connecting their power grid to BC.
I've looked through the FS and can't find a specific number to how much using LNG, trucked in from Fort Nelson and stored onsite, contributes to CAPEX. Primary electical power to the site will be 3 LNG powered turbine generators, with 3 diesel to use for reserve, emergency, etc.
Obviously we don't have anything else to go on, but if they "have grid power" provided (or have some of the costs offset), I have to imagine that'd help CAPEX and thus NPV, significantly.