Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Grid Metals Corp V.GRDM

Alternate Symbol(s):  MSMGF

Grid Metals Corp. is focused on both lithium and copper/nickel projects in the Bird River area, about 150 kilometers (km) northeast of Winnipeg, Manitoba. The Donner lithium project is a 75% owned property subject to a joint venture agreement. The MM copper/nickel project is a resource-stage project that is undergoing exploration and development work. All the Company’s southeastern Manitoba projects are located on the traditional lands of the Sagkeeng First Nation, with whom the Company maintains an exploration agreement. The Donner project is located about 145 km northeast of Winnipeg, Manitoba. Its Falcon West Lithium Property is located within the West Hawk Lake Greenstone Belt of southeastern Manitoba. The MM Project includes a copper-rich (Mayville) and a nickel-rich (Makwa) disseminated magmatic sulfide deposit along with three additional near-surface deposits (Page, Ore Fault, and New Manitoba). Its other projects include East Bull Lake palladium project, and Mayville PGE Zone.


TSXV:GRDM - Post by User

Post by Mookster3on Feb 27, 2023 10:07am
335 Views
Post# 35306943

Back of envelope, PEA for Main dyke

Back of envelope, PEA for Main dykeTable below gives results from the first 34 boreholes completed on the Donner Main dyke. Dyke width averages 3.8 m and grade 1.6 % Li2O, with widths holding up well, at depth. The drilled-off strike length of 800 m, depth of 300 m, width of 3.8 m, and specific gravity of 2.7, gives visibility to 2.5 mm tonnes of ore.
 
Considering Pilbara’s recent contract price of US $6300/t @ 6 % Li2O, the ore was recently worth $6300 x (1.6/6) = US $1680/t.  Assuming mining, milling and trucking costs on the order of $150/t, and recovery of 80%, this leaves US $1194/t operating profit, presumably split between Tanko ($597/t), Grid ($448/t) and Lithium Royalty ($149/t).  At a modest mining rate, e.g.,1000 t/d, (or 500 t/d each from the Main and NW dykes; 7 yr reserves @2.5 mmt), Grid could potentially earn $US 156 mm/yr at recent lithium pricing.
 
Grid appears to be hinting at a smaller scale, lower footprint, underground ramp operation that won’t require federal permitting. Capital costs will be low and permitting should be fast-tracked, because construction of a mill, tailings facility, headframe, shaft, base camp, hydro lines, etc., won’t be required and there’s already a logging road right to the site. Experienced miners should be available from Tanko’s Bernic Lake operation. Prediction; Grid has a decent chance of beating all of the bigger name lithium players into production, to become Canada’s fist new lithium miner, since Bernic Lake opened up in 1968. The market isn’t paying attention yet, and is assigning Grid an enterprise value of only $16 mm ($30 mm market cap- $14 mm cash), but that could soon change. Grid is about to submit an application for an advanced exploration permit that will allow them to take a bulk sample for test milling at the Tanko mill and the Aussies are involved in this, and they seem to know a thing or two about lithium.
 
Warning; The above numbers are just wild speculation and The Mookster, in no way, stands behind these numbers. Investors are encouraged to do their own DD.
    
Donner Main Dyke;  2018 -2023 Drilling
  Borehole   Dip  Distance along Strike
     (m)
  True
 Depth  
    (m)
Drilled
Width1
   (m)
 True
Width1  
  (m)  
  Grade
(% Li2O)
    22-45 -45   -150 sw  40      
    22-38 -45   -150  80 3.6  2.9 1.7
     22-39 -65   -150 150      
             
     22-34 -45    -75   40 3.4 2.8 1.5
     22-36 -65    -75   60 3.5 2.0 1.8
              
     22-35 -58    -50 150 3.8 2.5 1.6
     22-37 -65    -50 190 7.5 4.3 1.8
             
ML1-8        0   67   2.9 1.3
    22-40 -45      0 100 3.8 3.1 1.7
    22-41 -55      0 160 5.3 3.8 1.8
             
ML1-7     100   60    3.4 1.8
     22-31 -47   100   120 5.3  4.1 1.4
     22-33 -45   100  190 7.3 5.9 1.7
     22-32 -65   100  205 6.1 2.3 1.8
     22-37 -65   100  270 7.5 2.9 1.8
             
ML1-6     200   82   2.7 1.8
     22-29 -45   200 150 4.2 3.4 1.0
     22-30 -58   200    205 7.1 4.8 1.8
             
     22-27  -47   290     160 7.1 5.6 1.7
     22-28  -64   290  225 9.0 5.2 1.6
             
ML18-5     300 100    3.9  1.7
             
      22-23 -45   350   50 2.5  2.0  1.5
      22-24 -70   350 100 12.2  6.1 1.4
      22-25  -49   350  160 12.2  9.2 1.5
      22-26  -65   350 250 10.5  6.0 1.8
             
ML1-9     400   51    2.6  1.3
ML1-3     400   80    5.4  1.5
ML1-4     400  150    3.8  1.4
             
  22-42 -55  450  210 7.7 5.5 1.7
             
ML18-1     500   15    3.8  1.7
      22-21 -45   500   75 4.4  3.7  1.6
      22-22 -76   500  150 5.6  2.7  1.0
             
ML18-2     600   37    2.9  1.6
      22-19 -45   600  100 4.2  3.4  1.7
      22-20 -70   600  200 4.2  2.5  1.6
             
     22-43 -45   650 120      
     22-44 -65   650 160      
             
ML1-10     700 ne  106    0.7  0.4
          True Width Grade
 Li2O
         Mean (n=34)
 
3.8m  1.6 %
1) true widths assume dyke is subvertical with dip of -80o. Where multiple Li zones are encountered, width is the sum of all zones. Mean grade is width-weighted.

<< Previous
Bullboard Posts
Next >>