RE:interview pdac 2023Thank you C.
What was most significant about this very brief interview was the statement that the next major initiative will be to resume production at Murchison, once the FP is running smoothly.
The mill is fully operational, the mining camp is ready and they have stockpiled ore plus old but high grade tailings .
Plus, there is a very high grade oxide lode just below the pit floor of NOA pit 8.
All they need do is dewater the pit and production drill through the floor to access this legacy oxide resource.
By then, ODY will have defined sufficient ore to feed the Burnakura mill as well and can jointly fund the mill to 600,000 tpa equivalent to 30,000 ounces per year .
So, our future keeps getting brighter production wise..