RE:Info from News Release"All engineering plans are now finalised and surface scalping will shortly begin."
That is, to me, the best part, and at the right time of the year to start the build ie Spring.
Finally the Lego Masters (engineers) have finished design and detail drawings.
EPC concrete mob can now order materials and start bending reo bars for foundations.
The heavy steel fabricators can also order materials and prepare for fabrication.
Meanwhile the process plant site will be "scalped" to smooth out and level the earth in preparation for foundation and concrete slab laying.
That is an important first step in the build.