Vatu Aurum Breakdown KALO KALO.v ‘s Varu Aurum project sits in the prolific “Ring of Fire” in Fiji that has produced numerous large gold deposits.
KALO holds 100% interest in the 367km2 project where extensive areas of hydrothermal alteration and several areas of intense clay-sulphate alteration have been identified.
A CSMAT survey is set to be done this month that’ll cover a total of 12.5 square km over the Qiriyaga Hill Prospect - modelling has indicated there are a minimum of five high grade parallel veins that have been modelled within a large argillic alteration zone. It has excellent potential for the discovery of additional gold mineralization and expansion of the existing Qiriyaga Hill and Vuinubu Ridge Gold Deposits, both of which are open along strike and down dip.
https://kalogoldcorp.com/project/