RE:2023 Drill Program only 20,000 metres-The 2023 exploration program is anticipated to comprise a drill hole program totalling a minimum of 20,000 metres at the Goldstorm deposit and will target the north and northeast mineral extensions where the 2021 and 2022 drill hole programs intercepted gold, copper and silver mineralization.
In addition to the drilling at the Goldstorm deposit, the company plans to carry out exploration drilling at the Perfectstorm zone (PSZ) to follow up on six drill holes that were drilled in 2020 and 2021 which all intercepted gold and silver mineralization, highlighted by hole PS-21-06, which returned 118 metres of 0.66 g/t gold, 3.69 g/t silver and 31.5 metres of 0.84 g/t gold, 6.09 g/t silver. PSZ is a gold-dominant mineralized system measuring 1.3 kilometres in strike length and is located approximately 2.5 kilometres southwest of the Goldstorm deposit and approximately 2.5 kilometres northeast from Seabridge Gold's Iron Cap deposit near the southwestern boundary of the Treaty claim block.
you answered your own question..