Copper projection expected to lag behind demand Challenges in opening new copper mines are expected to leave production lagging behind demand that the green transition is creating
https://www.wsj.com/articles/copper-shortage-threatens-green-transition-620df1e5
Libero Copper & Gold (LBC.v LBCMF) controls 4 porphyry copper deposits in British Columbia, Argentina, and Columbia. LBC's Mocoa Project, located in Colombia, contains a pit-constrained resource with 636 million tonnes of 0.33% copper that is open in both directions.