RE:JV partner MIA They have a Feb 16/23 news release with 18 results from 97 "Shaw" backpack drill holes. These holes are all 1m sufrace results. It makes it difficult to make a proper assessment of such surface results.
They said the 2,128 metres of 2022 drilling would be released shortly. Since that was over three months ago, and given Ed's past history, leads me to assume the results were poor, and might not be released.