SIGMA LITHIUM TRUCKS GREEN LITHIUM AND TAILINGS - Sigma Lithium's first trucks loaded with Battery Grade High Purity Sustainable Lithium ("Green Lithium") and its dry stacked, zero chemicals high purity tailings ("Green Tailings") successfully arrived at the Company's two separate warehouse locations at Vitoria Port
- A total of 10 trucks were loaded on schedule this week, starting on Monday, April 24:
- 4 trucks with approximately 146 tonnes of Green Lithium
- 6 trucks containing Green Tailings to be upcycled into Battery Grade Lithium Concentrate
- On Wednesday, April 26, the trucks started to arrive at Brazil's Vitoria Port, recently selected for its enhanced logistics capabilities
- Vitoria Port is best suited for Sigma Lithium's increasing export operational scale, resulting from the successful market receptivity for its Green Tailings
- The Company remains on track to achieve full Phase 1 production capacity of 270,000 tonnes per annum by July 2023
VANCOUVER, BC, April 27, 2023 /PRNewswire/ -- SIGMA Lithium Corporation ("Sigma Lithium" or the "Company") (NASDAQ: SGML, TSXV: SGML), dedicated to powering the next generation of electric vehicles with Green Lithium, announced that it has successfully loaded the first trucks for its inaugural shipment of Green Lithium and tailings containing low grade concentrate from its Grota do Cirilo project in Brazil.
SIGMA LITHIUM TRUCKS GREEN LITHIUM AND TAILINGS TO VITORIA PORT IN PREPARATION OF 15,000 TONNE SHIPMENT OF EACH PRODUCT IN MAY (prnewswire.com)