RE:RE:RE:Final Hole!stockwatcher7 wrote:
Why wud they be drilling in proximity to 21. I don't understand the reasoning. Nice volume this a m but not moving up. 60,000 available at 10,5
DDRCCC23-043 was collared at the same location as DDRCCC21-021 (see news release dated December 13, 2021) and drilled at an azimuth of 005 degrees and a dip of -85 degrees (see Figures 1 and 3). The purpose of the hole was to fill in a gap of data in the current resource model and to extend the higher grade mineralization in the current resource to depth. The hole intersected dominantly MQMZ from surface to 111.25 m, metasediments intruded by metre scale MQMZ dykes to 318.45 m, dominantly MQMZ with metasediments to 382.1 m and then granite dykes with inclusions of MQMZ xenoliths to the end of the hole at 426.7 m. Quartz sulphide veins intersected all units with the highest intensity of veining occurring from 250 m to the end of the hole at 426.7 m. Visible gold was noted multiple times in quartz - bismuthinite veins. (see Figures 6 and 8).
Good post my friend