Hey someone figure the recovery numbers EWS RELEASE The news release was disseminated through the facilities of Globenewswire on June29, 2023 and subsequently filed on SEDAR. ITEM 4. SUMMARY OF MATERIAL CHANGE On June 29, 2023, the Issuer announced the successful completion of its pilot plant test work campaign for the Hellyer Project (“Hellyer”). The test results confirmed excellent liberation of critical and precious metals using the Issuer’s proprietary hydrometallurgical process and support the designed process flowsheet. ITEM 5. FULL DESCRIPTION OF MATERIAL CHANGE The Issuer reported that the pilot plant testing, undertaken at the world-renowned ALS Laboratory in Perth, Western Australia, operated continuously through the campaign without any process challenges. The test work processed about 500 kg of Hellyer tailings for the liberation of the critical and precious metals. The pilot plant confirmed earlier, bench-scale, findings for gold and silver recoveries from a cyanide leach on process solids, and generated a pregnant leach liquor suitable for the recovery of critical metals via conventional solvent extraction (SX) or ion exchange (IX). The head grade from the 500 kg of Hellyer tailings that went into the pilot plant averaged 2.59 g/t Au, 59 g/t Ag, 0.11% Cu, and 0.84% Zn. The data analysis shows the average gold and silver recoveries were both 90+% and were achieved on a cyanide leach feed material using Leachwell™ Accelerated cyanide leach techniques. In addition, 91% of the copper and 82% of the zinc contained within the tailings reported to the pregnant leach solution, where it is available for conventional SX and IX recovery
jmho