Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

E3 Lithium Ltd V.ETL

Alternate Symbol(s):  EEMMF

E3 Lithium Ltd. is a Canada-based lithium resource company. The Company is focused on commercial development of lithium extraction from brines contained in its mineral properties in Alberta. The Company’s Clearwater Project is located between Red Deer and Calgary in Alberta. Its Direct Lithium Extraction (DLE) on-exchange technology uses a sorbent designed to be selective towards lithium ions. Its technology reduces volumes of low-grade brine into a high-grade lithium concentrate, removing nearly all impurities. This produces a clean product for the development of high purity lithium compounds used in Li-ion batteries. The Company has measured and indicated lithium resources in Canada, with 16.2 million tons (Mt) measured and indicated Lithium Carbonate Equivalent (LCE), hosted in the Leduc Aquifer. In addition, it has 0.9 Mt of inferred mineral resources in its Rocky Area.


TSXV:ETL - Post by User

Post by Dibah420on Aug 25, 2023 7:20am
290 Views
Post# 35604922

Aug 24 Filing

Aug 24 FilingDirect Lithium Extraction (“DLE”) Field Pilot Plant On May 16, 2023, E3 Lithium began field pilot plant site construction and on August 3, 2023 construction was complete. The field pilot is designed to test and validate DLE technology in real-world operating conditions to develop the design and cost estimates for E3 Lithium’s first commercial facility. Outlined below are a set of parameters, or key performance indicators (“KPIs”), for the field pilot plant. E3 Lithium believes that achieving these KPIs will facilitate a design basis for the Pre-Feasibility Study (“PFS”) and provide a viable commercial operation. Along with testing its DLE technology to demonstrate commercial viability, E3 Lithium will also be testing third-party technology at its field pilot plant this summer and fall. Based on the results of testing, commercial readiness and economics, the Company will decide which technology to pursue for its first commercial facility. Choosing the appropriate technology path for the first plant will enable E3 Lithium to get to commercial operations as quickly as possible and reduce its project technology risk while controlling the cost and quality of the process and end product. The Company is working through the full process design for its PFS while taking into account data produced from the pilot, and in which fulsome project economics will be outlined. On July 6, 2023, the Company selected Fluor Corp. as its prime Engineering, Procurement and Construction (EPC) company to lead its PFS for the Clearwater commercial project. Fluor will provide overall PFS project management, design and oversight, and will be coordinating with several other firms hired by E3 Lithium that will provide specialty engineering services that include reservoir and well design, technical reports, and environmental studies. 3 Pilot KPIs E3 Lithium will measure the success of the field pilot plant against the KPIs below. Success Criteria Key Performance Indicator (KPI) Description Lithium recovery ≥ 80% Mass of lithium recovered from the mass of lithium in the feed Lithium grade in the lithium product stream ≥ 25% Concentration of lithium relative to other impurities (Na+K+Ca+Mg+Mn+Sr+B) ≥ 600 mg/L Concentration of lithium in the lithium product stream Flow rate ratio ≥ 3 Brine flow rate divided by the system volumetric capacity
<< Previous
Bullboard Posts
Next >>