DoumdidoumDo me a favour please.
I am confident that you have already done the math. So please share to save me the work.
Of the almost 4000 meters of drilling done.
If you add up the announced results, figure out what the average grade per hole is (the average from top to bottom). Then figure out what the average grade per meter drilled is, what is the answer?
I can figure it out for you, but why bother when you already did it.