RE:Sage's exceptional economic characteristicsWater consumption, brine and salt left on surface, and capital cost are the big 3 problems with potash. This looks like an ideal application of the Beechy design. 0.2 cubic feet per minute of water would easily support a 250,000 tpa mine using ths Beechy method, with a minimal footprint, no salt or brine on surface, a 12 month build on less then $100 million capital. The deposit appears to have small areas (Johnson well area) of thick high grade that could be mined with the Beechy selective solution mining techniqe with as little as 3 or 4 square miles of resource supporting a 250,000 tpa mine for 100 years. Exceptional indeed!