RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:From Joe he rig move takes a few weeks. The actual distance between the two pads is only 3-4 km, however, the road is closer to 20km. The rig needs to be completely disassembled and it takes 90 truck loads to move it to the new location.
The RCE-6 well is scheduled to spud before the end of September.
Thanks
Joe