Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

TAG Oil Ltd. V.TAO

Alternate Symbol(s):  TAOIF

TAG Oil Ltd. is an international oil and gas exploration company with a focus on operations and opportunities in the Middle East and North Africa. It holds an interest in the Badr Oil Field (BED-1), a 26,000-acre concession located in the Western Desert, Egypt, through a production services agreement (the PSA) with Badr Petroleum Company (BPCO). It is focused on BED-1 the re-completion and evaluation operations of the BED 1-7 vertical well. These initial operations are part of its phase I development program of Abu Roash F (ARF) reservoir in BED-1. The BED 1-7 well started oil production from the ARF reservoir. Its Field Development Plan (FDP), consisting of drilling 20 horizontal wells to be completed with multi-stage fracture stimulation, is focused on the east central part of the BED-1 concession area and contains OIIP P50 volumes of 178.3 million barrels and mean volumes of 179.0 million barrels. Its subsidiaries include TAG Energy International Ltd., CX Oil Limited, and others.


TSXV:TAO - Post by User

<< Previous
Bullboard Posts
Next >>
Post by Stampederon Sep 28, 2023 4:03pm
245 Views
Post# 35660228

TAG Commences Drilling Horizontal Leg of its BED4-T100 Well

TAG Commences Drilling Horizontal Leg of its BED4-T100 Well

This just in:

TAG Oil successfully drilled the vertical pilot hole to a depth of 3,290 meters. The Company recently performed open-hole logging, formation imaging, and pressure measurement, followed by cement plug-back of the lower vertical pilot hole. TAG Oil immediately proceeded into whip-stock drilling of build and lateral horizontal sections in the Abu Roash “F” (“ARF”) reservoir.

The open hole logs showed very similar results to those completed over nearby offset wellbores in BED-1. The ARF section was approximately 50 meters in thickness and was very close to the structural elevation anticipated. The horizontal portion of the T100 well will target oil in the ARF unconventional tight, carbonate reservoir. The lateral section of the horizontal well is expected to take approximately three weeks to drill and extend over 1,000 meters. TAG Oil will then move to complete the T100 well and remains on track to be completed and begin flow back testing during November 2023. TAG Oil will provide detailed drilling and completion updates in due course.

<< Previous
Bullboard Posts
Next >>