Excerpts of Nov. 29th, 2021 research report:.... "ATCO Gas could build a gas-fired power plant requiring no upfront capital from E3"
(PEA mentions cost being spread over life of project)
"Another additional advantage for E3 is high temperature (70-100C brine) and high flow rates allowing for the potential for geothermal power generation or heat recovery."
( look @ the pilot video gauge )
"The lithium-rich brine solution is flushed with a desorbent fluid. E3 needs very little desorbent, roughly 10l per 1,000l of brine."
(great ratio even if it's not being improved @ the pilot)
.