Corp slide deck updated.A few changes on the slide deck. A new. One added for the studies completed for the PFS, and we know that is almost done aswell, Jody Calvert seams to be added to the management team, and some others...I don't keep the old slide decks so just going of memory here...
2023 Catalysts | Path to first lithium
Timing Goal Milestones
Q1 2023 Resource upgrade to
Measured & Indicated
• Announce results of the Measured and Indicated upgrade
• Publish the NI 43-101 report (within 45 days of March 21, 2023)
Q2-Q4 2023 Field pilot plant • Obtain approval on facility license from the Alberta Energy Regulator
• Publish Key Performance Indicators (KPIs) on expected pilot performance
• Complete Detailed Engineering and Design
• Commence commissioning equipment on site
• Commence pilot operations
• Publish results against the previously outlined KPIs
Q3-Q4 2023 Lithium hydroxide
samples
• Initiate testing program with an industry leader for lithium hydroxide
production
• Publish results and specification of the lithium hydroxide produce
Q3-Q4 2023 Pre-Feasibility Study
(PFS)
• Engage Pre-Feasibility EPC firm
• Define capacity for the first commercial facility
• Studies completed for the PFS
• Publish the results of the PFS in early 2024
Last 3 left to go!