RE:RE:RE:RE:RE:RE:RE:A fine quarter , a little timing difference in cash flowWassana would have fixed and variable OPEX.
VLE would have paid the fixed Wassana OPEX such as vessel lease (and whatever else they felt needed an upgrade at Wassan that was not CAPEX) with no offsetting production which contributed to their higher corp OPEX in the quarter.