Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Suncor Energy Inc T.SU

Alternate Symbol(s):  SU

Suncor Energy Inc. is a Canada-based integrated energy company. The Company's segments include Oil Sands, Exploration and Production (E&P), and Refining and Marketing. Its operations include oil sands development, production and upgrading; offshore oil production; petroleum refining in Canada and the United States; and the Company’s Petro-Canada retail and wholesale distribution networks (including Canada’s Electric Highway, a coast-to-coast network of fast-charging electric vehicle (EV) stations). The Company is developing petroleum resources while advancing the transition to a lower-emissions future through investments in lower-emissions intensity power, renewable feedstock fuels and projects targeting emissions intensity. The Company also conducts energy trading activities focused primarily on the marketing and trading of crude oil, natural gas, byproducts, refined products and power. It also wholly owns the Fort Hills Project, which is located in Alberta's Athabasca region.


TSX:SU - Post by User

Comment by mrbbon Jan 13, 2024 1:57am
124 Views
Post# 35824880

RE:RE:Regulator approves TMX variance request

RE:RE:Regulator approves TMX variance request

The 2.3-kilometre section located beside the Fraser River, between Hope and the Burnaby Tank Terminal, was approved to be constructed with 36-inch pipe. However, Trans Mountain faced slow progress due to challenging horizontal directional drilling (HDD) conditions and proposed using a smaller 30-inch pipe that would not affect overall capacity.

For this decision, the Commission had to weigh the benefits against the drawbacks. Trans Mountain says that the variance could allow for the completion of the project around 59 days sooner than it would take to complete the project without the requested variance. This could bring approximately $400 million in additional revenue, along with benefits to shippers.

The Commission found that the drawbacks outweighed Trans Mountain’s stated benefits. Specifically, it had concerns about:

  • Quality of materials: Trans Mountain did not demonstrate compliance with its Quality Management Program. The company did not show that the quality of materials for the 30-inch pipe would meet the standard of those used in the rest of the TMEP.
  • In-line inspections: Trans Mountain did not demonstrate how they would conduct in-line inspections before beginning operations on the full 138.4-kilometre pipeline section between Hope and the Burnaby Tank Terminal. Without in-line inspections (ILI), they could not ensure the safety and integrity of this section of pipe to the same level as the rest of the TMEP.
  • Pipeline integrity and environmental protection: Trans Mountain did not adequately address potential environmental impacts from material quality changes and lack of ILI capability. Trans Mountain did not provide satisfactory responses or solutions to address the Commission’s requests for additional information.

On December 14, 2023Trans Mountain filed a new variance application for the same pipeline section. The CER is currently evaluating this application.

Quick Facts 
  • Trans Mountain applied for a variance on October 31, 2023, for changes to the diameter, wall thickness and coating of a 2.3-kilometre segment of the pipeline, citing challenges with HDD and a desire to expedite project completion.
  • The oral hearing was held on November 27, 2023, in Calgary, Alberta.
  • On December 5, 2023, the Commission denied the variance application.
  • Two letters of comment were filed:
    • November 20, 2023 – PetroChina Canada requested additional operations and finance information from Trans Mountain (C27347).
    • November 30, 2023 – CNRL, representing itself and four other producing and refining companies, expressed concerns with the variance and urged the CER to ensure that any actions taken do not contribute to delays in the TMEP’s in-service date (C27485).
  • This is Trans Mountain’s second application to change the conditions of its project approval since August 2023. The first was a deviation application in the Ppsell area. The Commission found that continuing micro-tunnelling would most likely fail and the alternative of HDD and open trench was more feasible.

Canada Energy Regulator issues reasons for decision for denying Trans Mountain’s pipe size variance application | BOE Report

My opinion on the variance:

- the 36 inch line is an slight over design (675000 bbl/day) anyway, to accommodate potential future new volume or problem like it is seeing now, above the expansion application flow rate 590000 bbl/day (85000 bbl/day extra over applied rate).  The revised short piece 30 inch line would introduce a bottleneck along the overall 36 inch line, reducing capacity estimated to be 469000 bbl/day from 590000 by my calculation, a 121,000 bbl/day reduction.  TMX could overcome this bottleneck by raising the pumping pressure along this short portion of the 2nd line if required in the future to get the pair line capacity back close to the original applied 590000 bbl/day. I think the regulator was concerned that TMX did not revise the spec nor address the pipeline quality management/inspection procedure on this short piece of pipeline but now TMX has satisfied regulator's concern.  

newtonboy wrote:

The artical states:
The Trans Mountain pipeline is Canada's only oil pipeline to the West Coast and its expansion will increase the pipeline's capacity to 890,000 barrels per day from 300,000 bpd currently.  

Anyone have an idea on how much the reduced diameter of the pipe will reduce the BPD flow rate? I'm no "iron-ringer" but I do know if you choke a garden hose the flow is reduced. 

 


 