RE:2023 production cycles Hannamuk wrote: Q1 20,475 bbls/day
Q2 22,097
Q3 19,961
Q4 19,165
Seems on par with Mubadala performance
That's btw. the firstworld style. The nunbers are right and don't look very impressive.
But it's the short story. The longer story is:
Wassana was out for 3 quarters. They drilled the 2 (very important) wells at Wassana and only operated one rig. So these 2 wells were missing at other fields (500-1000 bpd p.a.).